Quoting Secondary Machining for Aluminum Extrusions

Ten bars look like enough for 120 aluminum guide rails. Each finished rail is 246 mm long, so the order contains 29,520 mm of profile. Ten bars with 3,000 mm of usable length apiece provide 30,000 mm. Yet a shop that mills both ends of every rail could run out of stock with ten rails still due. To compare secondary machining quotes, check which end condition each shop has priced.

The cut list changes when both ends get milled

Consider an order with two proposed routes. One shop can precision-saw each rail to its finished length. The other wants to saw a longer blank and mill 1 mm from each end. Both offers include a notch and a cross-hole on each rail. If the drawing specifies a milled end face, only the second offer meets that process requirement. If it specifies the finished length, end squareness and surface finish, ask the first shop how it will demonstrate all three. The Aluminum Extruders Council’s cutting guide describes saw selection for different cut angles, lengths and tolerances.

For this example, each bar has 3,000 mm available after end trims and any unusable gripping length. Each blank takes one separating cut with a 3 mm saw kerf. The figures below assume nominal cuts and no rejected pieces.

Cut-list itemSaw to finished lengthSaw blanks, then mill both ends
Sawn blank length246 mm248 mm
Bar length consumed per blank, including kerf249 mm251 mm
Length needed for 12 blanks2,988 mm3,012 mm
Complete blanks per 3,000 mm bar1211
Bars needed for 120 finished rails1011

On the two-end milling route, the first ten bars each yield eleven blanks and leave a 239 mm remnant. Each remnant is too short for another 248 mm blank. The eleventh bar supplies the last ten blanks and leaves 490 mm.

The first route has just 12 mm to spare per bar after twelve cuts. Before ordering exactly ten bars, confirm the supplier’s minimum usable length and the kerf of the blade it will actually use. If the stock supplier offers longer bars, ask for a price based on at least 3,012 mm of guaranteed usable length per bar. At 3,012 mm, twelve nominal blanks fit exactly. Any increase in blank length or kerf raises the usable length needed.

If only End A needs milling and a sawn End B meets the drawing, ask the shop to price that route too. With 1 mm left on End A, each 247 mm blank consumes 250 mm including kerf. Twelve blanks use exactly 3,000 mm, so ten bars cover the nominal order with no allowance for a wider kerf or a longer blank.

The same calculation matters when one supplier saws the blanks and another finishes them. A nominal 248 mm measured along the long edge of a slanted cut tells the machine shop little about the stock left at the short edge. Agree on a blank length and a squareness limit that leave enough material to clean up both faces. The saw supplier can measure length and squareness before shipping, and the machine shop can use those limits to quote the end milling.


Which features can use the existing extrusion die?

Follow the rail along its length. A lip runs down the inside of the open channel and guides a sliding block. Near one end, a short notch in the lip clears a tab on the end plate. A cross-hole passes through one specified side wall into the channel. The extrusion die supplies the continuous lip. A shop can cut the local notch and drill the hole from stock with that same cross-section.

For a repeat order, moving the hole or lengthening the notch calls for a revised machining drawing. The shop may need a different stop or a change to its workholding.

A change to the height of the lip along the whole rail raises a different purchasing question. If the existing profile has enough metal and the cutter can reach the full length of the lip, ask for a machining price. For a thin lip, have the shop explain how it will support the rail during the cut and check the lip dimensions after unclamping. If the new section must come from the die, send the revised cross-section with the aluminum extrusion inquiry so the supplier can assess the tooling. Keep any extrusion tooling charge separate from a fixture charge for machining the rail.


Measuring the hole location from finished End A

Suppose the center of the cross-hole must lie 20.00 ± 0.10 mm from finished End A. The shop places sawn End A against a fixture stop and drills the hole center 20.00 mm from that face. It then removes 1.00 mm from that end. The hole center now lies 19.00 mm from finished End A, below the 19.90 mm lower limit. Milling 1.00 mm from End B then brings the 248 mm blank to its finished length of 246 mm. The hole center is still 19.00 mm from finished End A.

Side view of a rail with the same hole center 20.00 mm from sawn End A and 19.00 mm from finished End A.

One workable sequence is to finish End A first and use that face to locate the rail for drilling. A supplier proposing to drill earlier can show how it controls the stock later removed at End A. On the first rail, measure both overall length and the distance from the finished face to the hole center. A length reading by itself would miss the shift.

Look inside the channel as well. The drill breaks through the wall beside the sliding block’s path. A burr there can catch the block even when the hole is on location. Mark the hole exit for deburring and identify the adjacent guide lip that needs to retain its profile. The guide to deburring machined parts covers hole-exit burrs and drawing notes for edges that need attention.

For this order, the comparable quote is a price for 120 finished rails from the specified alloy, temper and profile revision. It includes the agreed end condition, the notch and cross-hole, and a first-piece record of hole location from finished End A.

For stock priced by the meter, multiply the rate by the total length the supplier will bill. Add any separately quoted sawing, machining, inspection and one-time tooling charges payable on this order. Divide that total by 120 for the first-order price per rail. For a repeat order, confirm which tooling charges the supplier would bill again. If a supplier charges for whole bars, ask how many it has priced and who keeps the remnants. At the quoted lengths, ten bars cover the order if the sawn ends meet the drawing. Milling 1 mm from each end takes eleven bars.

Leave a Comment

Scroll to Top

Get a quote

Click or drag files to this area to upload. You can upload up to 10 files.
File format:txt pdf doc docx xls xlsx ppt pptx jpg png zip rar dwg dxf dwt dws

3D File Format: STEP, STP, SLDPRT, IPT, PRT, SAT, IGES, IGS, CATPART, X_T, OBJ, STL